NEWS – STRATFORD, U.K., REDEVELOPMENT MODIFIED

  • 23 September 2019
  • Posted By: lift-installations.com
  • News

Architects’ Journal recently reported that PLP Architecture has reworked its plans for a co-living tower for developer The Collective in Stratford, East London. Former plans for a complex including a 30-story building on 0.64 ha on Stratford High Street have been changed to those for a 22-story, 287-room hotel with co-working space. Three existing buildings on the site will be demolished. The Collective has built a co-working/-living space in Old Oak Common in northwest London (also designed by PLP) and has a new second branch in Canary Wharf (designed by SOM). It is hoping the new plans for the site, which have been in limbo since 2015, will meet London Plan requirements and be approved. Requirements include providing an “affordable housing contribution and issues relating to inclusive design and transport,” the source said.

Contact

Lift Installations O.E.
1st km Goumenissa - Griva, GR-61300 Goumenissa, Kilkis
Werkzeuglager-, Biebricher Allee 67, D-65187 Wiesbaden, Hesse
Phone: +30 2343 110-291
Fax: +30 2343 110-290
Email: info@lift-installations.com
Christos Chatzimladis
(Dipl. Ing.)
Mobile GR: +30 698 00 3 11 55
Mobile DE: +49 152 38 559 569
Email: chatzimladis@lift-installations.com
arr

About Us

Lift Installations O.E.

Newsletter

Latest News


NEWS

30 March 2020

NEWS

26 March 2020

Contact Info

1st km Goumenissa – Griva, GR-61300 Goumenissa, Kilkis
Tool store -, Biebricher Allee 67, D-65187 Wiesbaden, Hessen

Phone: +30 2343 110-291
Fax: +30 2343 110-290
Email: info@lift-installations.com